Master Plan for a 400 acre park for 12 buildings totaling approximately 3,900,000 S.F.
Master Planning included layout of the buildings, parking lots, truck courts, and service driveways.
Building 1 was distribution facility for Home Depot initially a speculative building, retrofitted to Home Depot specifications. 544,838 s.f. building on a 70 acre site with a truck trailer storage lot.
Building 2 speculative building of 540,000 s.f. expandable to over 1,000,000 s.f. on a 102 acre site.
Site of Buildings 3 & 4 were graded to a pad ready state with construction of detention & water quality ponds, storm drainage systems, and utility services.
Building 4 was subsequently purchased by Whole Foods and built as a 110,000 s.f. cold storage warehouse.
Building 12 currently under construction is a speculative 600,000 s.f. building on a 60 acre site.
Services Provided:
- Master Planning
- Land Planning
- Site Civil Engineering
- Landscape Architecture