Switch Facility, Verizon Wireless, Birmingham

Switch Facility, Verizon Wireless, Birmingham

New greenfield 40,000 s.f. switchgear facility.

Design required incorporating the existing office park pond into landscape design.

Plantings were designed to create a more natural look for the office park.

Services Provided:

  • Permitting
  • Site Civil Engineering
  • Storm Water Management
  • Landscape Architecture